Week 6: Work Study

OCT. 3rd 2018--Small-Scale Bogie


Task Items:


  • Continue Research
  • Develop concepts
  • Email Powder Coater

Summary:

Today all teams went to their respective groups and worked on their project. For today I worked on updating my Gantt Chart to include important dates, such as presentation dates and paper assignments. Additionally, I calculated the friction requirements for the bogie at grades 8 and 12 percent. Each calculation verified that both concepts of rubber and aluminum wheel (for flange wheels) will work with the track teams design goals. I also got the contact information for the powder coating lead and will be able to meet later next week. 

Comments

Popular posts from this blog

Week 11: Small Scale Bogie

Week 8: Lecture

Week 7: Rapid Prototyping